Journals
  Publication Years
  Keywords
Search within results Open Search
Please wait a minute...
For Selected: Toggle Thumbnails
Coupling model and its algorithm for coordinated scheduling of quay crane and truck under uncertain environment
FAN Lubin, LIANG Chengji, SHE Wenjing
Journal of Computer Applications    2016, 36 (3): 843-848.   DOI: 10.11772/j.issn.1001-9081.2016.03.843
Abstract637)      PDF (977KB)(358)       Save
The container terminal system is a complex production system which is composed of many subsystems, and the equipment scheduling in the system is also a complex problem which involves a variety of uncertainties. The probability distribution of equipment operation parameters was considered emphatically, and the coordinated scheduling problem between quay crane and yard truck was studied. The method of multidisciplinary variable coupling design optimization with time window constraint was presented, the yard truck distribution sub-model and yard truck configuration sub-model were built. Completion time and the number of trucks were regarded as public design variables to connect the two submodels, and the coupling model for coordination scheduling was established. This model selected data from a terminal of Shanghai port, and called Gurobi4.0 to solve the coupling model under the environment of Visual studio2012. Compared the final scheduling project with the original project, the cost of total delay time decreased by 90.69%, and the number of container trucks decreased by 30.76%, which shows that the model is effective and practical.
Reference | Related Articles | Metrics